A725

A725 - Paint Inspection

A725


In July 2020 James Proudfoot completed an inspection of James Street and Bellshill Roundabout which spans over the A725.


For Amey, Scotland a pre-specification painting survey was carried out on Bellshill Roundabound and James Street parapets to determine the condition of the existing protective coating system.


Thickness measurements, adhesion tests, salt tests and paint flake samples were taken for lead testing.






Share by: